Figure
6a (1 of 3) |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| |
ALLOCATION & SCHEDULE WORKSHEET |
Project____________Atlas Equipment Show Booths___ |
#_____00417__________ |
|
| |
By______________CS_________ |
Date___Apr
27_____ |
Sheet__1__of____3____ |
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Trial X |
Trial Y |
|
|
| |
Task
- What to do |
Cannot Start |
Who |
Staff |
Calendar |
Who |
Staff |
Calendar |
Plan d |
|
| |
|
Resource - With what to
do it |
Before |
|
a Time |
b Time |
|
a Time |
b Time |
Sequence |
|
| |
1 |
Install
Conveyor System - Part A |
16 |
CS |
18 |
16 |
CS |
18 |
16 |
A-2a |
|
| |
|
110
V, 220 V, air |
|
| |
2 |
Install
Conveyor System - Part B |
16 |
CS |
18 |
16 |
CS |
18 |
16 |
A-2b |
|
| |
|
110
V, 220 V, air |
|
| |
3 |
IAC
Work Station |
1, 2, 16 |
CS |
0.5 |
16 |
CS |
0.5 |
16 |
A-6 |
|
| |
|
110 V |
|
|
| |
4 |
Aero-motive
Work Station (uprights) |
1, 2, 16 |
CS |
1 |
16 |
CS |
1 |
16 |
A-7 |
|
| |
|
110 V |
|
|
| |
5 |
Bio-fit
Work Station |
1, 2, 16 |
CS |
0.5 |
16 |
CS |
0.5 |
16 |
A-5 |
|
| |
|
110 V |
|
|
| |
6 |
Stackbin
Work Station |
1, 2, 8, 13, 16 |
CS |
0.5 |
16 |
CS |
0.5 |
16 |
A-8 |
|
| |
|
110 V |
|
|
| |
7 |
Carton
Flow Rack |
1, 2, 13, 16 |
CS |
2 |
16 |
CS |
2 |
16 |
A-9 |
|
| |
|
|
|
|
|
| |
8 |
Catwalk |
|
1, 2, 13, 16 |
CS |
2 |
16 |
CS |
2 |
16 |
A-4 |
|
| |
|
|
|
|
|
| |
9 |
Package
Scale |
1, 2, 3, 13 |
CS |
0.25 |
16 |
CS |
0.25 |
16 |
A-11 |
|
| |
|
Power
(?) |
|
| |
10 |
Regular
Shelving |
1, 2, 3, 16 |
CS |
0.25 |
16 |
CS |
0.25 |
16 |
A-12 |
|
| |
|
|
|
|
|
| |
11 |
Pallet
Rack (A-side) |
16, 17, 34 |
CS |
1 |
16 |
JB |
1 |
16 |
A-13 |
|
| |
|
|
|
|
|
| |
12 |
Vacuum
Hoist (control box) |
1, 2, 8, 13, 16 |
CS |
1 |
16 |
CS |
1 |
16 |
A-10 |
|
| |
|
110
V, 220 V |
|
| |
13 |
Crane
for Vacuum Hoist (Met-Track) |
1, 2, 16 |
CS |
2 |
16 |
CS |
2 |
16 |
A-3 |
|
| |
|
|
|
|
|
| |
14 |
Biofit
Chairs |
16 |
CS |
0.25 |
16 |
CS |
0.25 |
16 |
A-14 |
|
| |
|
|
|
|
|
| |
15 |
Sit/Stand
Chair |
16 |
CS |
0.25 |
16 |
CS |
0.25 |
16 |
A-15 |
|
| |
|
|
|
|
|
| |
Reference Notes: |
|
CS |
47.5 |
16 |
CS |
46.5 |
16 |
|
|
| |
a. |
In hours required |
Downtotals |
|
|
| |
b. |
In hours available |
and |
|
|
|
JB |
1 |
16 |
|
|
| |
c. |
Special carpet (#16) in
both booths |
Adjustments |
|
|
|
|
|
| |
d. |
Tasks 1 through 15 for A
booth; 17-44 for B booth |
|
|
|
|
|
|
|
|
|
| |
e. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|